Field Superintendent
Welder
Objective:Field Superintenden for McBurney . Corp. from 1985 to 2008
Various projects for McBurney Power Services including construction of new
facilities;, repairs to existing facilities; rebuilds of existing facilities;
and numerous shut-down jobs of all types.
2007-2008 McBurney Corp. Fordyce, Arkansas worked in McBurney Branch office in
Fordyce, Ar. Layed off 1/6/09
Qualifications:2006-2007 United States Sugar Corp.- Clewiston, Fl.: Construction
Supt. Construction of Sugar Process Plant largest in USA.
2005-2006; Some small shut-down and repair projects in USA
2004-2005; Electrowatt-Ekono Thailand Ltd- Pichit, Thailand;
Construction/Advisor for (1) 200,000 PPH boiler for 20 MW Power Plant.
2004; Blue Ridge Paper, Canton, Nc.; Supervised retrofit of coal burners,
feeders, and controls for coal fired boiler.
2003; Proteus Power Co., Guayquil, Ecuador; Construction/Advisor to replace
refractory in (2) oil fired power boilers.
2002; Ambro S.A.,Suceava, Romainia; Construction advisor for installation of 20
TPH HRT wood waste fired boiler.
2001-1999; Energia Verdia, San Francisco, Mostazal, Chile; Construction advisor
for complete installation of 20 TPH HRT boiler system also for complete
construction of 25 TPH HRT boiler and fuel system.
1997-1998; Appleton Estates Sugar Plant and Rum Distillery, Appleton, Jamaica,
W.I.; Construction advisor for the rebuilding/retrofit of (2) 75,000 PPH field
erected bagasse fired boilers and (1) 60,000 oil fired package boiler.
1994;Hunt-Wesson, inc., Savannah, Ga, Installation of food processing equipment,
piping, foundations and setting of (3) oil tanks.
1994; Louisiana Pacific Corp., Bernice, La; Complete rebuild of (3) HRT boiler
furnaces and retube of (2) boilers.
Education
Attended Fordyce Public School, Fordyce, Arkansas
1965- Welding School- Arkansas
Reference upon request:
Relevant Experience; Continue from Qualifications;
1994; Sugar Cane Growers, Co-Op, Belle Glade, Fl.; Completely retubed a 150,000
PPH boiler.
Federal Paper Board, Newberry, Sc.; Installation of new scrubber and ductwork.
1993; Hunt Plywood Co., Inc., Pollock, La.; Installation of Package Boiler and
modifications to fuel system and completely retubed oa HRT wood fired boiler.
1992; Okeelanta Corp., Okeelanta, Fl.; Installation of 150,000 lb/hr Package
Boiler, piping and controls.
1991; Okeelanta Corp., Okeelanta, Fl., Wood Yard installation of conveyors and
wood hog.
THE McBURNEY CORPORATION
1987-1988; Pyro Power, Ames, Ia., Field Superintendent-construction of fluidized
bed coal fired boiler, Iowa State University.
1986-1987; General Electric, Biddeford, Me: Field Supt.- construction of (2)
power boilers, household garbage, fuel fired. Continue on other experience;
Other Experience
1986-1985; International Paper, Selma, Al.; Construction of wood fuel handling
system for a 400,000 PPH boiler system.
1970-1985; Sisson Welding & Construction Co.; Dry Kiln Construction-Sawmill
Construction; Self Employed.
1968-1970; Russell Dry Kiln Co., Fordyce. Ar.; Dry Kiln and Sawmill Construction
Worked as a Foreman.
1966-1968 worked as welder.
1965-1966. Bob’s Welding Service, Fordyce, Ar.; Welder
1963-1965; Plastics Mfg. Co., Dallas, Tx. Equipment Operator
1962-1963; Fordyce Lumber Co., Fordyce, Ar. 1959-1962; U S NAVY -- MCBURNEY YEARS